Note
Note: The Required column includes the following values:
Required: The field must be included in the POST call.
Read-only: The field is received in the GET call and required in the PUT call. It is not required in the POST call. You cannot edit this field.
Optional: If the field was received in the GET call, include it in the PUT call. This field is editable.
Internal: (For Sizmek Ad Suite (SAS) internal use) If the field was received in the GET call, include it in the PUT call.
Parameter |
Description |
Type |
Required |
Notes |
---|---|---|---|---|
type |
Currency calculation mode. |
String |
Required |
Possible values include: For ad hoc reports:
For scheduled reports:
|
defaultCurrency |
Currency defined for the account. |
Integer |
Read-only |
1 - USD USD 2 - Australian Dollar AUD 3 - GBP GBP 4 - Euro EUR 5 - New Israeli Shekel ILS 6 - Yen JPY 7 - Danish Korona DKK 8 - Brazilian Real BRL 9 - New Zealand Dollars NZD 10 - Canadian Dollar CAD 17 - Singapore Dollars SGD 19 - Indian Rupee INR 20 - United Arab Emirates Dirham AED 21 - Czech koruna CZK 22 - Pakistani Rupee PKR 23 - Polish zloty PLN 24 - Hungarian Forint HUF 25 - Swiss Franc CHF 26 - Swedish Krona SEK 27 - Norwegian Krone NOK 32 - Mexican Peso MXN 34 - Hong Kong Dollar HKD 35 - South African Rand ZAR 36 - Baht THB 37 - South Korean won KRW 38 - New Taiwan Dollar TWD 39 - Turkish Lira TRY 40 - Romanian leu RON 41 - Slovak koruna SKK 42 - Croatia Kuna HRK 43 - Bulgarian Lev BGN 44 - Renminbi CNY 45 - Argentine Peso ARS 46 - Philippine Peso PHP 47 - Russian Ruble RUB 48 - Ringgit Malaysia MYR 49 - Columbian Peso COP 50 - Chilean Peso CLP 51 - Vietnamese Dong VND 52 - Indonesian Rupiah IDR 53 - Serbian dinar RSD -1 - Original Currency These values are omitted when there is no cost or revenue metrics in the report. |
targetCurrency |
Currency in which you want to see your cost data. |
Integer |
Required |
|
currencyExchangeDate |
Date to perform currency conversion. |
String |
Required for ad-hoc reports |
"2016-03-27" - Should be in format of "YYYY-MM-DD" This value is omitted if you run an ad hoc report or if there is no selected value for cost metrics. If you run a scheduled report, the exchange date will be evaluated from the type field. |
Comments